Tuesday, May 26, 2009

Much ado about a bridge 2

In my post "Much ado about a bridge" (which was published in the Toronto Sun best of blogs section) I talked about the showdown over the railway grade separation at Strachan Avenue, between East Liberty and Douro, just south of King. Biking Toronto is reporting that the City of Toronto's preferred option will be carried forward. Much more expensive than raising Strachan above the railway corridor, the new plan calls for the tracks to be lowered below their current alignment and pass under Strachan. This option is the optimal solution according to the planning matrix, but it does cost $100 million more. Carrying this option forward is a sign that citizens are willing to spend more on a project when the urban design benefits will be greater, but I still wonder what would have happened if this project was being paid for entirely from the City of Toronto's capital budget. Would they have pushed for this option with as much zeal, or is this just reckless speculation?

Labels: , , ,

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home